Photo credit: TfNSW
Rendel Limited has been appointed to undertake the Proof Engineering services for the detailed design of the Enabling Works for Parramatta Light Rail Stage 2. This appointment follows our successful tender bid with John Holland.
Our involvement as part of the Enabling Works will begin with the delivery includes Proof Engineering services for a new 340-metre long concrete segmental, post-tensioned bridge over the Parramatta River, between Wentworth Point and Melrose Park.
Parramatta Light Rail Stage 2 will see the delivery of 14 stops over a new 10-kilometre two-way track, with travel times of around 31 minutes from Camellia to the Carter Street Precinct via Sydney Olympic Park, and a further seven minutes to the Parramatta Central Business District.
PROJECT DETAILS
Location: | Australia |
Client: | John Holland |
Date: | 2023 – 2025 |
Services: | Peer review, Independent design check, Proof engineering |
KEY CONTACTS