Industrial port project with offshore structures including navigational aids and dredging works. It also included extensive armoured revetment for coastal and facilities protection. The offshore SBM structure, sea outfalls and jetties required the use of extensive coastal and offshore engineering computations for wave forces and sediment transport.
- Bulk liquid material handling installations
- CALM offloading buoy
- 1km multi-berth jetty supported on steel piles
- Dredging
- 1.2 km breakwater
- Coast protection revetment
- Seawater intake and outfall
Rendel’s services included:
- PMC services
- Design review
- Construction supervision
- Equipment commissioning
- Contract management and administration
PROJECT DETAILS
Location: | Vietnam |
Client: | PetroVietnam |
Date: | 2004-2010; 2017 |
Services: | Lead maritime engineer; construction; supervision design review |